These processes are for generators in Idaho and Oregon.
1. 资格要求
2. Application
- 有资格在任何时间提交
- Idaho 发电机并网 Request Application Form
- 现场控制示范
- 30兆瓦以下的发电机:1000美元押金
- Generators over 30 MW: Deposit determined by the FERC Jurisdiction Large 发电机并网 Procedures (LGIP)
3. 可行性研究:30个工作日
包括对系统影响的一般审查, capacity constraints and any potential issues with the customer’s choice of point of interconnection.
4. 系统影响研究:30-45个工作日
Provides a detailed assessment of transmission system adequacy to accommodate the project. This step may not be necessary for some projects, depending on size and location.
- 附表72系统影响研究协议
- Up to $10,000 deposit
5. 设施研究:30-45个工作日
Includes design and engineering studies to determine design and specifications. 提供了构造选项 to the customer.
- 附录72设施研究协议
- Up to $30,000 deposit
6. 互联协议
All projects are subject to technical requirements under the 互联协议s once the project becomes operational.
Tier 1
1. 资格要求
In addition, the application must meet approval criteria in the Tier 1, Section 2 (a) – (e) in the 小型发电机互连规则.
- Must use lab-tested, inverter-based interconnection equipment
- 电气铭牌容量25kW或以下
- Must not be interconnected to a transmission line
2. Application
- 有资格在任何时间提交
- Application for Small Generator Facility Interconnection Tier 1 Interconnection
- 现场控制示范
- $100 deposit
3. 申请审核:15个工作日
- If the application is approved, the request will proceed to the 互联协议
- If the application is not approved, may submit a new application to Tier 2
4. 互联协议
All projects are subject to technical requirements under the 互联协议s once the project becomes operational.
- 互联协议 for Small Generator Facility Tier 1, Tier 2, Tier 3, 或第4层互连
- Small Generator Facility Interconnection Certificate of Completion Form
- Witness Test
Tier 2
1. 资格要求
In addition, the application must meet approval criteria in the Tier 2, Section 2 (a) – (1) in the 小型发电机互连规则.
- Does not qualify for, or failed to meet Tier 1 eligibility requirements
- 电气铭牌容量为2mw或以下
- Interconnected to a radial distribution circuit or a spot network distribution circuit limited to serving one customer
- Must not be interconnected to a transmission line
- Must use interconnection equipment that is either lab-tested or field-tested
2. Application
- 有资格在任何时间提交
- Application for Small Generator Facility Interconnection Tier 2, Tier 3, Tier 4 Interconnection
- 现场控制示范
- $500 Deposit
3. 申请审核:20个工作日
- If the application is approved, the request will proceed to the 互联协议
- If the application is not approved, may submit a new application to Tier 3
4. 互联协议
All projects are subject to technical requirements under the 互联协议s once the project becomes operational.
- 互联协议 for Small Generator Facility Tier 1, Tier 2, Tier 3, 或第4层互连
- Small Generator Facility Interconnection Certificate of Completion Form
- Witness Test
Tier 3
1. 资格要求
In addition, the application must meet approval criteria in the Tier 2 Section 2 (a), (h) and (j), 第3层第3 (a) - (c)条 小型发电机互连规则.
- Does not qualify for, or failed to meet Tier 1 or Tier 2 eligibility requirements
- 电气铭牌容量为10mw或以下
- Must not be interconnected to a transmission line
- Must not export power beyond the point of interconnection
- Must use low forward power relays or other protection functions that prevent power flow onto the area network
2. Application
- 有资格在任何时间提交
- Application for Small Generator Facility Interconnection Tier 2, Tier 3, Tier 4 Interconnection
- 现场控制示范
- $1,000 deposit
3. 申请审核:20个工作日
- If the application is approved, the request will proceed to the 互联协议.
- If the application is not approved, may submit a new application to Tier 4
4. 互联协议
All projects are subject to technical requirements under the 互联协议s once the project becomes operational.
- 互联协议 for Small Generator Facility Tier 1, Tier 2, Tier 3, 或第4层互连
- Small Generator Facility Interconnection Certificate of Completion Form
- Witness Test
Tier 4
1. 资格要求
In addition, the application must meet approval criteria in the Tier 4 Section 5 (A) and (B) in the 小型发电机互连规则.
- Does not qualify for, or failed to meet Tier 1, Tier 2 or Tier 3 eligibility requirements
- 电气铭牌容量为10mw或以下
2. Application
- 有资格在任何时间提交
- Application for Small Generator Facility Interconnection Tier 2, Tier 3, Tier 4 Interconnection
- 现场控制示范
- $1,000 Deposit
3. 申请审核:15个工作日
- If the application is approved, the request will proceed to the 互联协议.
- If the application is not approved, proceed to the Feasibility Study.
4. 可行性研究:30个工作日
包括对系统影响的一般审查, capacity constraints and any potential issues with the customer’s choice of point of interconnection. 这一步可能不是所有项目都需要的.
5. 系统影响研究:30-45个工作日
Provides a detailed assessment of transmission system adequacy to accommodate the project. 这一步可能不是所有项目都需要的.
- Small Generator Facility Interconnection System Impact Study Agreement
- 设施连接要求
- Up to $1,000 deposit
6. 设施研究:30-45个工作日
Includes design and engineering studies to determine design and specifications. 提供了构造选项. 这一步可能不是所有项目都需要的.
- Small Generator Facility Interconnection Facilities Study Agreement
- Up to $1,000 deposit
7. 互联协议
All projects are subject to technical requirements under the 互联协议s once the project becomes operational.
1. 资格要求
- Standard Interconnection Procedures and Agreements Adopted for Large Qualifying Facilities (QF-LGIP)
- 大于20mw但等于或小于80mw
2. Application
- 有资格在任何时间提交
- 大型发电机互连应用
- 现场控制示范
- 或$10,000不可退还的场地管理保证金
- $10,000 Deposit
3. 可行性研究:45个日历日
包括对系统影响的一般审查, capacity constraints and any potential issues with the customer’s choice of point of interconnection
4. 系统影响研究:90个工作日
Provides a detailed assessment of transmission system adequacy to accommodate the project
- qf系统影响研究协议
- 数据要求类似于 过渡聚类研究提交清单
- $50,000 Deposit
- 现场控制示范
- Idaho Power may also study report in the FERC Cluster Study in accordance with Section 4.2 of the QF-LGIP
5. 设施研究:90-180日历天
Includes design and engineering studies to determine design and specifications. 提供了构造选项 to the customer.
- qf设施研究协议
- $100,000 Deposit
6. 互联协议
All projects are subject to technical requirements under the 互联协议s once the project becomes operational.
For assistance with a PDF on this page or to request a PDF in an alternate format, 请与客户服务部联系 208-388-2323 or 1-800-488-6151